Installation Instructions
19
Figure 13 Typical Liebert FPC equipment arrangement
Liebert FPC
Remote Emergency
Power Off Switch (REPO)
Ground electrode conductor
(not by Liebert ) required per
NEC for units with transformer
3-phase , 3-wire plus ground
for units with transformer
3-phase , 4-wire plus ground
for units without transformer
Main input power to unit
(not by Liebert )
*Transient suppression plate
Main input junction box and cable
* Flexible distribution cables
per customer specifications
* Optional devices : Refer to the
specification sheet for options
supplied
Low voltage junction
box and cable
Building interface and
alarm connections
(not by Liebert )