Emerson Liebert FPC Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Networking Emerson Liebert FPC. Emerson Liebert FPC User manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj

Podsumowanie treści

Strona 1 - With VPMP

AC PowerFor Business-Critical Continuity™Liebert® FPC™ With VPMPUser Manual - 15 kVA -300kVA, 3 Phase, 50 & 60 Hz

Strona 2 -

Installation Instructions6Figure 3 Recommended minimum service and ventilation clearancesNOTE1. Service access is required at the front and rear. 2. S

Strona 3 - TABLE OF CONTENTS

Installation Instructions71.1.5 Floor Pedestal InstallationFloor pedestals are optional equipment that provide clearance for bottom cable entry or exi

Strona 4

Installation Instructions81.2 Additional Distribution Mounting and WiringFor Liebert® FPC™s with more than four panelboards, the additional panelboard

Strona 5

Installation Instructions91.3 Power and Control WiringPower and control wiring should be installed by licensed electricians. All power and control wir

Strona 6 - 1.0 INSTALLATION INSTRUCTIONS

Installation Instructions10Figure 5 Electrical connection location for 23" (584mm) cabinetFigure 6 Electrical connection location for 47" (1

Strona 7 - Cabinet Dimensional Data

Installation Instructions11Figure 7 Electrical connection location for 47" cabinet with Square D I-Line panelboard Front ViewWithout Doorsand Acc

Strona 8 - 47" (1194mm)

Installation Instructions12Table 4 Suggested minimum input wire size datakVAInputVoltageUnits with Transformers Transformerless UnitsInputFLAInputOPDS

Strona 9 - 1.1.4 Location Considerations

Installation Instructions13150208 427 600 (2) 350 kcmil * 416 600 (2) 350 kcmil *240 370 500 (2) 250 kcmil * - - -380 234 300 350 kcmil 228 300 350 kc

Strona 10

Installation Instructions141.3.2 Junction Box InstallationMain input (power) and low-voltage (control) junction boxes are available for the Liebert® F

Strona 11 - Installation Instructions

Installation Instructions15Figure 8 Low-voltage control junction box connections, typicalFigure 9 Main input junction box connections, typical1.3.3 Sy

Strona 13 - 1.3 Power and Control Wiring

Installation Instructions16Equipment GroundingEquipment grounding is primarily for safety. Correct implementation of grounding also enhances equipment

Strona 14 - FPC15206

Installation Instructions17Recommended methods for running the grounding electrode conductor (arranged by preference for system performance; as accept

Strona 15 - FPC15202

Installation Instructions181.3.5 Output Power ConnectionsOutput circuit breaker(s) and/or panelboards with ground and neutral provisions are provided

Strona 16

Installation Instructions19Figure 11 Typical Liebert® FPC™ equipment arrangementLiebert FPCRemote Emergency Power Off Switch (REPO)Ground electrode c

Strona 17

Installation Instructions201.3.6 Control Wiring ConnectionsLiebert® power conditioning systems have provisions for external shutdown control from Remo

Strona 18

Installation Instructions21Figure 13 Typical low-voltage junction box (if used) control wiring for units without monitoring212019181716151413121110987

Strona 19 - 1.3.3 System Grounding

Installation Instructions22Figure 14 Typical low-voltage junction box (if used) control wiring for units with monitoring212019181716151413121110987654

Strona 20 - Signal Reference Grid

Installation Instructions23Figure 15 Control wiring for units without low-voltage control boxBuilding Interface RelayRemove jumperwhen 5th customerala

Strona 21 - Typical Liebert FPC

Installation Instructions241.3.7 Adapter BoardThe Adapter Board (AB) provides customer interface to the Liebert® FPC™ monitoring systems for units wit

Strona 22 - WARNING

Equipment Inspection and Startup252.0 EQUIPMENT INSPECTION AND STARTUP2.1 Internal InspectionA detailed internal inspection should be performed after

Strona 23 - Liebert FPC

iTABLE OF CONTENTS1.0 INSTALLATION INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21.1 Unpa

Strona 24

Equipment Inspection and Startup26Table 11 Torque specifications, generalElectrical connectionswith 1 Belleville washerElectrical connectionswith 2 Be

Strona 25 - Terminal Strip

Inspection and Startup Checklist273.0 INSPECTION AND STARTUP CHECKLIST3.1 Inspection ___ 1. Confirm that the exterior of unit is undamaged (including

Strona 26 - FPC15550

Inspection and Startup Checklist28___ 4. Check and record the input voltages at the junction box:Volts, Phase A to Phase B = ______________Volts, Phas

Strona 27 - LDM13009

Inspection and Startup Checklist293.3 Monitoring System Checklist Basic Indicators___ 1. Turn On the building power to the unit, then turn the main in

Strona 28 - 1.3.7 Adapter Board

Inspection and Startup Checklist303.4 Equipment Connection Check-Out of Units With Distribution Cables___ 1. Turn on main input power to the unit, the

Strona 29

Operating Instructions314.0 OPERATING INSTRUCTIONS4.1 Startup Procedures Before the unit is placed into service after initial installation, after equi

Strona 30

Operating Instructions324.2 Basic Monitor PanelBasic Monitoring provides transformer overtemperature alarm, transformer overtemperature shutdown and E

Strona 31 - 3.2 Startup

Operating Instructions334.3 Power Monitor PanelLiebert Power Monitor Panel with Velocity protocol (VPMP) provides input voltage, output current and vo

Strona 32

Operating Instructions34The VPMP detects and annunciates by alarm message the following conditions:• Output Overvoltage• Output Undervoltage• Output O

Strona 33

Operating Instructions354.4 Liebert Current Plus Monitoring (If Supplied)Liebert Current Plus Monitoring (Liebert CPM) provides the current and voltag

Strona 34

iiFIGURESFigure 1 Typical cabinet and floor planning dimension data, 23" (584mm) cabinet, 15-125 kVA . . . . . . . . 3Figure 2 Typical cabinet

Strona 35 - 4.0 OPERATING INSTRUCTIONS

Operating Instructions36The following metering parameters may be displayed:• Voltage - Line-to-Line• Voltage - Line-to-Neutral• Neutral Current• Groun

Strona 36 - 4.2 Basic Monitor Panel

Operating Instructions374.5 Liebert Distribution Monitoring (If Supplied)The Liebert Distribution Monitoring (Liebert LDMF) provides the current and v

Strona 37 - 4.3 Power Monitor Panel

Operating Instructions38The following metering parameters may be displayed:• Voltage - Line-to-Line• Voltage - Line-to-Neutral• Neutral Current• Groun

Strona 38 - Operating Instructions

Maintenance395.0 MAINTENANCE5.1 RepairEven the most reliable equipment may fail. Liebert Services is at your service to assure fast repair of your uni

Strona 39

Ensuring The High AvailabilityOf Mission-Critical Data And Applications.Emerson Network Power, a business of Emerson (NYSE:EMR),is the global leader i

Strona 40

1IMPORTANT SAFETY INSTRUCTIONSELECTROMAGNETIC COMPATIBILITY—The Liebert FPC complies with the limits for a Class A digital device, pursuant to Part 15

Strona 41

Installation Instructions21.0 INSTALLATION INSTRUCTIONS1.1 Unpacking and Installation1.1.1 Unpacking and Preliminary InspectionA quality installation

Strona 42

Installation Instructions3Figure 1 Typical cabinet and floor planning dimension data, 23" (584mm) cabinet, 15-125 kVATable 1 23-inch cabinet weig

Strona 43 - 5.0 MAINTENANCE

Installation Instructions4Figure 2 Typical cabinet and floor planning dimension data, 47" (1194mm) cabinet 50-300kVATable 2 47-inch cabinet weigh

Strona 44 - SL-20417_REV2_08-12

Installation Instructions51.1.3 Unit PreparationThe Liebert® FPC™ may be easily removed from the shipping pallet and installed by customer personnel.

Komentarze do niniejszej Instrukcji

Brak uwag