
Quick Start Guide
3
May 2015
Step 1: Mount the transmitter
Liquid flow applications
1. Place taps to the side of the line.
2. Mount beside or below the taps.
3. Mount the transmitter so that the
drain/vent valves are oriented above the
process.
Gas flow applications
1. Place taps in the top or side of the line.
2. Mount beside or above the taps.
Steam flow applications
1. Place taps to the side of the line.
2. Mount beside or below the taps.
3. Fill impulse lines with water.
4801_QIG_RevMA.fm Page 3 Wednesday, May 6, 2015 1:15 PM
Komentarze do niniejszej Instrukcji