Emerson E2 Instrukcja Operatora Strona 19

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 71
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 18
19
Begin the process by logging on. To do this press the
Log In/Out button on the E2. When prompted, enter
“USER” in the username field and “PASS” in the pass-
word field. To access the screens shown in
figures 3.17 and 3.18:
1. Press menu to open the Main Menu.
2. Press 7 (System Configuration).
3. Press 7 (Network Setup).
4. Press 1 (Online Status).
5. Press F1 (CST Status).
Figure 3.19 CST Network Screen (Prior to Node
Recovery)
If modules have previously been commissioned they
will be listed on the CST Network Screen. If you are
repairing or replacing an existing module, please refer
to section 5 of this document. If no modules have
been commissioned, the screen should look like
figure 3.19 above.
3.11 Node Recovery
To begin the node recovery process, proceed as
follows:
1. Press F4 (Node Recovery).
2. You will be prompted to enter the number of nodes
to recover. Proceed by entering the number of
compressors that are connected to this rack
controller. They must all be powered up and con-
nected to the E2 via the RS485 network. There
are two other options that can be followed regard-
ing this node recovery process. Refer to Optional
Commissioning Procedures below for additional
information.
3. Press Enter to begin the node recovery process.
The nodes will be found in random order.
After communications have been established with a
module, the E2 screen will update and list the device
as Node Found. Because this process establishes
communications with each device individually, it may
take several minutes depending on the number of
modules present.
3.12 Optional Commissioning Procedures
Option 2: Another procedure is to work with one rack
at a time. To do this, turn the power on to the units that
are on the first rack, leaving the other rack “off”. For
the number of nodes, enter the number of
compressors that are connected to the E2 and have
power. When it is time to recover the nodes of the
second rack, turn off power to the first rack and
energize the second rack. Enter the number of
compressors that are on the 2nd rack that are
communicating to the E2.
Option 3: During the previous node recovery process
options, modules were randomly assigned a node
address as they were found by the E2 on the
communications network. This resulted in randomiza-
tion of the compressor order as they were located and
shown on the CST network screen (figure 3.4).
Option 3 may be used to identify the nodes in the
order that the compressors are located, left to
right. Option 3 does take more time (node recovery
takes approximately 1 1/2 minutes per compressor).
Begin the node recovery process by powering up only
the first compressor on the rack. For the number of
nodes enter “1”. After node number 1 is found, turn off
the power to compressor number 1 and power up only
the second compressor on the rack. Repeat the node
recovery process by entering “1” for the number of
nodes. Continue until all devices have been assigned
a node number—one compressor on at a time, one
node to recover at a time.
3.13 Configuring Applications
Once all of the communicating devices have been
found, the E2 will return to the CST Network Screen
to show a summary of the commissioning results
(refer to figure 3.20 below). Check the list to be sure
that all modules are present. If any are missing, refer
to sections 4.4.2 and A.3 to troubleshoot communica-
tions issues.
AE8-1337 R1
Przeglądanie stron 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 70 71

Komentarze do niniejszej Instrukcji

Brak uwag